Implementation of the HVAC and sanitary installations in Phase 1 and 2.
Waterworks: floor heating and cooling, supply for the air groups, supply for heaters.
Aerodynamic works: air groups 30.000m³/h, recovery batteries, control: DDC + centralized technical management - acoustic insulation NR32.
Project realized with the intervention of the Fund FEDER, CGT and FWB.
- Client: SA Galère
- Developer: City of Mons
- Architect: C. MENU
- Location: Mons
- Year: 2005 - 2007 (fase 1) | 2012 - 2013 (fase 2)