HVAC installation for offices and laboratories in Wetenschapspark Waterschei.
Installed heating power: 600kW.
Installed cooling capacity: 415 kW + drycooler 535 kW.
Air handling units: 24 500 m3/h.
Climate beams: 177 pieces.
- Client: Stad City of Genk
- Developer: City of Genk
- Engineering office: VK Engineering
- Location: Mining site Waterschei, Genk
- Year: 2013-2014